Looking for the perfect Gift? Give a memorable gift with an offshore fishing gift voucher, from Noosa Charters! Buy Alprazolam 2Mg Online Australia Buy Soma 350mg online worldwide delivery. Generic Carisoprodol Soma (Watson brand) overnight shipping. Cheap Soma without prescription. ForeTabs Online Pharmacy 21 Promo Codes for Soma.com

Buy Watson Diazepam
Buy Soma Fast Shipping

Frame up at Sedley Taylor

  • January 2015

Work at Sedley Taylor Road is moving along at a good pace. The photos show the ground floor steel frame to the L-shaped extension, the basement enclosure and the striped-out roof above the existing first floor landing.

Night Classes at EF School

  • December 2014

The school opened two weeks ago and the building maintenance manager has sent us this photo of the new classroom block and main entrance at EF on Hills Road. Recently completed energy calculations demonstrate that the extension achieves an “A” rating.

Cav Ave at Dawn

  • December 2014

Adams and Newman Contractors have completed the refurbishment and extension of 32 Cavendish Avenue.  Andrew sent us this shot taken at 7am on the morning of the handover.  Who else gets up this early?

NRAP School Days

  • December 2014

Here is a short clip of the central atrium at EF, taken with my shaky iPhone.  Each classroom has a translucent screen that allows projected images to be seen in the classroom and the atrium simultaneously.

Buy Lorazepam 2Mg

EF Move to New School

  • December 2014

NRAP Architects are pleased to announce the completion of a multi-million pound highly innovative project to refurbish and extend EF Language School on Hills Road in Cambridge. Proposals were 5 years in the making and received planning permission last summer. Balfour Beatty, the main contractor, started construction last Autumn and completed the work in a little over 14 months.

The progressive design creates a relaxed and studious atmosphere. Twenty naturally lit and naturally ventilated classrooms are arranged on two levels around a series of linked communal spaces and a double height atrium.  Translucent glass screens in place of white boards allow projected images to be simultaneously viewed in the classroom and the atrium space. North-facing roof lights within the extension provide a high level of natural lighting without generating glare or overheating. Floors have been removed within the retained building to create a dramatic triple-height space in the heart of the institution.  Elsewhere floor levels have been adjusted to allow disabled access to every room.  The relatively compact layout and deep plan creates an energy efficient envelope, enclosing well-lit and generous spaces. Sustainability measures also include an array of solar cells on the roof and high levels of insulation within the new extension.

This year NRAP Architects are celebrating 25 years in business.  The completion of this building is certainly something for them to celebrate.

EF Progressing

  • August 2014

The scaffolding to the atrium has been struck, revealing a calm and light interior.  Glazed screens to the classrooms and windows within the zinc facades are in the process of being installed.

NRAP site progress at EF

  • February 2014

Work to refurbish and extend EF is progressing well. The 1980′s extension was demolished in a couple of days and the steel frame for the extension was erected in about a week ! Weaving steels through the retained villa is a little more time consuming.